On 6 December 2021, UTAS submitted a request to the Hobart City Council for a Planning Scheme Amendment (PSA) for rezoning of the Sandy Bay campus site. UTAS’ PSA request incorporated its Sandy Bay Masterplan Report (Masterplan), which set out UTAS’ plans for the Sandy Bay campus site in detail.

UTAS subsequently withdrew its PSA request to, in its words, “enable further engagement through council processes”.

I expect the PSA request and Masterplan to be re-submitted in the near future. The Shake Up Panel’s Report suggests by December 2023, but others will know the likely timelines and process from now better than me.

  • In which case, please comment below or let me know by email.

As I do not believe wholesale changes are likely to the next version of UTAS’ PSA request and Masterplan, and as UTAS provided the PSA request and Masterplan of 6 December 2021 in a very unhelpful form on its website when it released them on 11 July 2023, I am providing an index to those documents and their appendices with click links in the table below.

  • I will publish a blog post on the transparency of UTAS’ so-called Transparency Project soon, together with my assessment of its performance on Right to Information based on my own substantial experience.

Using the table below, I suggest people familiarise themselves with the sections of UTAS’ 2021 PSA request and Masterplan that interest them, so that they are as well placed as possible to contribute when the documents re-emerge for public comment. Public consultation timelines are sometimes a bit short for the matters to be considered, and these are very long documents.

DocumentAuthor/
Consultant
DateClick Link (the page numbers listed are the page numbers in the pdf).Comment
Introductory noteUTASDrafted for UTAS’ on-line release of the documents on 11 July 2023Part 1, page 1This is a one
page introduction
to UTAS’ request
for a Planning Scheme Amendment, including the Sandy Bay Masterplan.
Cover letter to UTAS’ request to HCC for a Planning Scheme AmendmentLetter from Matt Higgs (UTAS Properties) to Kelly Grigsby6 Dec 2021Part 1, page 2 
Request for Planning Scheme Amendment – University of Tasmania – Sandy Bay CampusAll Urban
Planning
6 Dec 2021Part 1, pages 3-71Main report
Appendix A – Certificates of Title & Owners Consent  Part 1, pages 72-103 
Appendix B – Letters from TasWater and TasNetworks  Part 1, pages 104-106 
Appendix C – Proposed Planning Scheme Amendment  Part 1, pages 107-151 
Appendix D – Proposed Planning Scheme Amendment with explanatory notes  Part 1, pages 152-180 
UTAS Sandy Bay Masterplan ReportClarke Hopkins Clarke Architects
with Playstreet and Dock4
5 Dec 2021Part 1, pages 181-215
Part 2, pages 2-32
Part 3, pages 2-76
Part 4, pages 2-19
 Main report
Appendix 1 – Proposed Buildings ListClarke Hopkins Clarke

 Part 4, pages 20-21Proposed
Building
Plan for
Concept Masterplan
Appendix 2 -Stakeholders ListClarke Hopkins Clarke

 Part 4, pages 22-23 
Appendix 3 – Building Heights + Setbacks PlansClarke Hopkins Clarke

 Part 4, pages 24-29 
Appendix 4 – Reimagine Sandy Bay: Engagement SummaryClarke Hopkins Clarke

 Part 4, pages 30-77 
Appendix 5 – Market Assessment ReportDeepEnd Services3 Dec 2021Part 4, pages 78-170 
Appendix 6 – Natural Values Assessment + Ecological Impact AssessmentNorth Barker Ecosystem Services 3 Dec 2021Part 4, pages 171-257 
Appendix 7 – Conservation Management Plan (Volume 1)Paul Davies Architect8 Sept 2021Part 4, pages 258-368 
Appendix 7 – Conservation Management Plan (Volume 2)Paul Davies Architect
9 Sept 2021
Part 5, pages 2-301Building
data
sheets
Appendix 8 – Transport StrategiesMR Cagney3 Dec 2021Part 5, pages 302-329Cover (1 December 2021) conflicts
with version control on date
Appendix 9 – Civil Engineering AssessmentGHD5 Dec 2021Part 5, pages 330-391 
Appendix 10 – Environmental Site AssessmentGES (Geo-Environmental Solutions)3 Dec 2021Part 5, pages 392-588
Part 6, pages 2-91
Cover (September 2021) conflicts
with version control on date
Appendix 11 – Aboriginal Heritage AssessmentCultural Heritage Management Australia2 Dec 2021Part 6, pages 92-205 
Appendix 12 – Economic Impact AssessmentDeepEnd Services3 Dec 2021Part 6, pages 206-281 
Appendix 13 – Traffic Impact AssessmentGTA Stantec2 Dec 2021Part 6, pages 282-441 
Appendix 14 – Landscape & Visual Impact AssessmentOrbit Solutions6 Dec 2021Part 6, pages 442-583 
Appendix 15 – Heritage Impact AssessmentPaul Davies Architect1 Dec 2021Part 6, pages 584-662