On 6 December 2021, UTAS submitted a request to the Hobart City Council for a Planning Scheme Amendment (PSA) for rezoning of the Sandy Bay campus site. UTAS’ PSA request incorporated its Sandy Bay Masterplan Report (Masterplan), which set out UTAS’ plans for the Sandy Bay campus site in detail.
UTAS subsequently withdrew its PSA request to, in its words, “enable further engagement through council processes”.
- See ABC story from 14 July 2022.
I expect the PSA request and Masterplan to be re-submitted in the near future. The Shake Up Panel’s Report suggests by December 2023, but others will know the likely timelines and process from now better than me.
- In which case, please comment below or let me know by email.
As I do not believe wholesale changes are likely to the next version of UTAS’ PSA request and Masterplan, and as UTAS provided the PSA request and Masterplan of 6 December 2021 in a very unhelpful form on its website when it released them on 11 July 2023, I am providing an index to those documents and their appendices with click links in the table below.
- I will publish a blog post on the transparency of UTAS’ so-called Transparency Project soon, together with my assessment of its performance on Right to Information based on my own substantial experience.
Using the table below, I suggest people familiarise themselves with the sections of UTAS’ 2021 PSA request and Masterplan that interest them, so that they are as well placed as possible to contribute when the documents re-emerge for public comment. Public consultation timelines are sometimes a bit short for the matters to be considered, and these are very long documents.
Document | Author/ Consultant | Date | Click Link (the page numbers listed are the page numbers in the pdf). | Comment |
Introductory note | UTAS | Drafted for UTAS’ on-line release of the documents on 11 July 2023 | Part 1, page 1 | This is a one page introduction to UTAS’ request for a Planning Scheme Amendment, including the Sandy Bay Masterplan. |
Cover letter to UTAS’ request to HCC for a Planning Scheme Amendment | Letter from Matt Higgs (UTAS Properties) to Kelly Grigsby | 6 Dec 2021 | Part 1, page 2 | |
Request for Planning Scheme Amendment – University of Tasmania – Sandy Bay Campus | All Urban Planning | 6 Dec 2021 | Part 1, pages 3-71 | Main report |
Appendix A – Certificates of Title & Owners Consent | Part 1, pages 72-103 | |||
Appendix B – Letters from TasWater and TasNetworks | Part 1, pages 104-106 | |||
Appendix C – Proposed Planning Scheme Amendment | Part 1, pages 107-151 | |||
Appendix D – Proposed Planning Scheme Amendment with explanatory notes | Part 1, pages 152-180 | |||
UTAS Sandy Bay Masterplan Report | Clarke Hopkins Clarke Architects with Playstreet and Dock4 | 5 Dec 2021 | Part 1, pages 181-215 Part 2, pages 2-32 Part 3, pages 2-76 Part 4, pages 2-19 | Main report |
Appendix 1 – Proposed Buildings List | Clarke Hopkins Clarke | Part 4, pages 20-21 | Proposed Building Plan for Concept Masterplan | |
Appendix 2 -Stakeholders List | Clarke Hopkins Clarke | Part 4, pages 22-23 | ||
Appendix 3 – Building Heights + Setbacks Plans | Clarke Hopkins Clarke | Part 4, pages 24-29 | ||
Appendix 4 – Reimagine Sandy Bay: Engagement Summary | Clarke Hopkins Clarke | Part 4, pages 30-77 | ||
Appendix 5 – Market Assessment Report | DeepEnd Services | 3 Dec 2021 | Part 4, pages 78-170 | |
Appendix 6 – Natural Values Assessment + Ecological Impact Assessment | North Barker Ecosystem Services | 3 Dec 2021 | Part 4, pages 171-257 | |
Appendix 7 – Conservation Management Plan (Volume 1) | Paul Davies Architect | 8 Sept 2021 | Part 4, pages 258-368 | |
Appendix 7 – Conservation Management Plan (Volume 2) | Paul Davies Architect | 9 Sept 2021 | Part 5, pages 2-301 | Building data sheets |
Appendix 8 – Transport Strategies | MR Cagney | 3 Dec 2021 | Part 5, pages 302-329 | Cover (1 December 2021) conflicts with version control on date |
Appendix 9 – Civil Engineering Assessment | GHD | 5 Dec 2021 | Part 5, pages 330-391 | |
Appendix 10 – Environmental Site Assessment | GES (Geo-Environmental Solutions) | 3 Dec 2021 | Part 5, pages 392-588 Part 6, pages 2-91 | Cover (September 2021) conflicts with version control on date |
Appendix 11 – Aboriginal Heritage Assessment | Cultural Heritage Management Australia | 2 Dec 2021 | Part 6, pages 92-205 | |
Appendix 12 – Economic Impact Assessment | DeepEnd Services | 3 Dec 2021 | Part 6, pages 206-281 | |
Appendix 13 – Traffic Impact Assessment | GTA Stantec | 2 Dec 2021 | Part 6, pages 282-441 | |
Appendix 14 – Landscape & Visual Impact Assessment | Orbit Solutions | 6 Dec 2021 | Part 6, pages 442-583 | |
Appendix 15 – Heritage Impact Assessment | Paul Davies Architect | 1 Dec 2021 | Part 6, pages 584-662 |